PROJECT OVERVIEW
Phoenix Project #1809
This project sought to renovate an old structure located on Main Street USA, and transform it into a mixed-use space of modern residential and retail units. The $30MM project would help transform a part of Main Street and become a hot spot for locals.
Soon after the placement of new foundations inside the Powerhouse building, an elevator pit was subsequently added to the project’s scope of work. Unfortunately, it was concluded that the freshly poured foundations would be undermined by the construction of the proposed elevator, thus requiring pit underpinning to extend these foundations to a lower elevation.
The underpinning was installed in late December, just before the holidays. Phoenix’s crew battled the extreme cold temperatures and snow storms to complete this project in a safe and timely manner.