Site Requirements & Coordination

To maintain safe and efficient operations, Phoenix requires:

  • Clear, level, and stable working platforms
  • Adequate access and laydown areas for materials and drilling equipment
  • Potable water supply (minimum 2″ connection at 60 GPM, 60 psi)
  • 110V or 480V electrical service for equipment as applicable
  • Continuous spoils management and disposal by others (unless otherwise included)

We coordinate closely with the construction team to ensure uninterrupted production and compliance with schedule milestones.

Geothermal Borehole Drilling Gallery