Site Requirements & Coordination
To maintain safe and efficient operations, Phoenix requires:
- Clear, level, and stable working platforms
- Adequate access and laydown areas for materials and drilling equipment
- Potable water supply (minimum 2″ connection at 60 GPM, 60 psi)
- 110V or 480V electrical service for equipment as applicable
- Continuous spoils management and disposal by others (unless otherwise included)
We coordinate closely with the construction team to ensure uninterrupted production and compliance with schedule milestones.