Site Requirements & Coordination
To maintain safe and efficient operations, Phoenix requires:
-
Clear, level, and stable working platforms
-
Adequate access and laydown areas for materials and drilling equipment
-
Potable water supply (minimum 2″ connection at 60 GPM, 60 psi)
-
110V or 480V electrical service for equipment as applicable
-
Continuous spoils management and disposal by others (unless otherwise included)