Quality Assurance & Testing

Each geothermal borehole is pressure tested before installation and monitored throughout grouting to confirm full and uniform fill. Thermal conductivity tests and performance verification are available to ensure compliance with design parameters.

We work directly with the Construction Manager, Owner’s Design team or other Geothermal Contractors to ensure that bore spacing, depth, and system performance will be properly installed.

We have State Certified Well Drillers, National Groundwater Association (NGWA) Accredited Drillers, International Ground Source Heat Pump Association (IGSHPA) Accredited Installers, and McElroy certified fusing Installers on staff for every project. We have great partners within the Geothermal industry who we trust to perform portions of the work in case our workload increases.